Over three hours of video is provided below for your training needs. Each section has four videos, and each video has on average five subtopics that are covered within the video. Once the video launches and is buffered, you can skip to a topic using the topic navigation links at the bottom of the video. The four main sections cover Prime Bid basic usage, and the videos below that are advanced topics. You can scroll down to the video you want, or use the simplified navigation to the right.
Subcontractor Database / Broadcast Fax and Email
1. Creating a Bid Vendor Database (8:13)
- Starting a Bid Vendor Database
- Sorting the Source Database
- Selecting Vendors from the Source Database
- Using Lookup Criteria
2. Running a Broadcast Invitation (7:30)
- Modifying the Broadcast Template
- Selecting the Broadcast Type
- Selecting the Broadcast Template
- Adding Attachments to the Broadcast
- Executing the Broadcast
3. Tracking the Broadcast Results / Reports (10:12)
- Running the Bid Vendor Database Filters
- Tracking the Bid Confirmation Status
- Telephone Calling
- Specific Contact Notes
- Subcontractor List Printouts
- Good Faith Reports
4. Editing the Vendor Database (9:15)
- Editing Vendor Records
- Editing Vendor Records in a Grid
- Importing / Exporting a Vendor Database
Prime Bid File Setup
5. Bid Information / Bid Setup (7:18)
- Managing Bid Files
- Filling in the Bid Information Sheet
- Understanding the Bid Setup Window
- Configuring the Multi-user Setup
6. Setting up the Summary Page (7:00)
- Editing Indirect Costs
- Reviewing Sales Tax Considerations
- Editing Markups
- Editing Bond Calculations
7. Adding Sections to a Bid (8:44)
- Using Different Filters to Edit Data
- Adding Sections through the Input Filters
- Adding Sections from a List
8. Editing Matrices (5:47)
- Creating a New Matrix
- Adding Sections into a Matrix
- Organizing Matrices
Inputting / Analyzing Bids
9. Inputting Bids into a Matrix (12:18)
- Adding a Vendor's Bid into a Matrix
- The Role of the Bid Vendor Database
- Scope Items Worksheets
- Horizontal vs. Vertical Views
10. Analyzing Bids in a Matrix (8:28)
- Reviewing the Solutions of a Matrix
- Conditioning Bids in a Matrix
- Understanding the Matrix Analysis
11. Reviewing Bid Results in Filters (12:03)
- Reviewing Bids in the Matrix Recap Filters
- Comparing the Low vs. Second Matrix Results
- Subcontractor / Supplier Lists
- Reviewing the Bid Details Filters
12. Reviewing the Overall Bid in Filters (9:52)
- Understanding the Summary Filters
- Understanding the Details Filters
- Understanding the Category Filters
Bid Closing
13. Adjusting the Summary View Elements (4:41)
- Understanding the Category Summary
- Understanding the Division Summary
- Changing Indirect Costs and Markups on the Fly
- Cut and Add Bid Total Adjustment
14. Performing the DBE Analysis (6:04)
- Displaying the Qualified DBE Subcontractor Options
- Selecting the DBE Subcontractors
- Running the DBE Best Fit
15. Completing the Alternate Bids (10:14)
- Requiring the Low Base Bidder in the Alternates
- Understanding the Derived Bid Calculation
- Implementing the Derived Bid
16. Closing Out the Bid in the Tabular Window (5:19)
- Reviewing the Base Bid and Alternate Totals
- Subcontractor Listing
- Bid Breakdown Totals
- DBE Listing
Advanced Videos
17. Setting up Alternates (8:38)
- Adding an Alternate to a Bid
- Replicating the Base Bid Sections
- Configuring the Alternates in the Matrices
- Replicating the Base Bid Addons
18. Setting up a Bid Using a Bid Template (10:53)
- Adjusting the Summary View
- Editing the Costs for Self Performed Work
- Adding/Deleting Sections in a Matrix
- Customizing Sections in a Matrix
19. Understanding Scope Items for Sections of Work (6:52)
- Editing the Scope Items Worksheet
- Calculating Scope Item Adjustments
- Reviewing Scope Items in the Vertical View
20. Editing the Database Lists (5:27)
- Modifying the Divisions List
- Modifying the Sections List
- Modifying the Job Cost Phase
21. Configuring the Bid Breakdown Lists for a Bid (4:47)
- Assigning Bid Breakdowns to Sections
- Adding a Unit Quantity to the Bid Breakdowns
- Assigning Job Cost Phases to Sections to Create a Budget
22. Printing Filters and Reports (7:19)
- Using the Filters as Reports
- Understanding the Prime Bid Reports
- Viewing the Print Preview
- Configuring the Print Options
23. Exporting Bid File Information (4:09)
- Exporting Grid Information to a File
- Exporting a Job Cost Budget
24. Importing a Vendor Database (4:58)
- Aligning the Record Fields
- Using a .csv/.txt File
We Value Customer Feedback
Prime Bid is customer-driven software. It is a tool specifically designed by general contractors to optimize results on bid day to produce the best lowest number.
Our goal is to make this the most useful piece of software for our customers and so we work with them and utilize suggestions for feature enhancements. In the past two versions of our software there have been over 80 customer suggested improvements.
